Result showed: During the lower tunnel crossing construction when upper tunnel was normal operating, because of the subway train vibration, the tunnel under construction and in-built both had large vertical vibration responding displacement increment.
结果表明:当上部隧道正常运行状态下进行隧道下行穿越施工时,由于地铁列车振动荷载作用下穿隧道及运营地铁隧道都将产生较大的竖向振动响应位移增量。
In this paper, it is mainly discussed that changes of the vehicle weight and vehicle speed affect the vertical displacements, vertical accelerations and horizontal stresses of the grade crossing plate.
着重讨论车辆轴重、速度的改变对道口板的竖向位移、竖向加速度和水平应力的影响。
a structured system where the interplay of crossing horizontal and vertical lines establishes the rule.
一个由交叉的水平线和垂直线相互作用确立规则的有序体系。
英语网 · 高考英语
英语网 · 英语词汇
英语网 · 双语新闻
英语网 · 双语娱乐资讯
英语网 · 初中英语作文