长途电话段
One-way Traffic Trunk Road Coordination Control Based on Zhongguancun West Zone
中关村西区的单向交通干线协调控制
In the thrust nappe zone, the size of the trunk fault F 201 and its active intensity both mainly affect the stability of the dam being built.
逆冲带内的主干活动断裂F201的规模及活动强度是影响坝址稳定的主要因素。
英语网 · 双语娱乐资讯